• On 31st October until 1st November 2013: working hours as usual (office and production including shipment from supplier)
• There will be no internal sweeping to our operator by PUK (member of union); if sweeping occurs from outside we will prevent.
• coordinate to anticipate all production to shop: all position (MGR/SPV/GF) à managers are not allowed to take leave (between 28/10 ~ 1/11)
• Demonstration participant should be PUK (member of union) à leader (MGR) should allow them.
• Entrance / exit doors every building should be only one (1) main door.
• Office staff should think idea as demonstration representative (along with PUK)
• All factory visit will be canceled (31/10-1/11) and all important meeting (large scale) will be canceled
• Socialize anticipation planning 31/10-1/11 to all gm/plant/mgr by HRD (by email)
• Coordinate all shop/prod for shift 2 operator
• Inform all lunch time preparation to all employee
• Production should anticipate from Friday 25/10 :
1. shift 1 only line a and b (line c will be shift 2)
2. shift 2 line a / b / c
3. shipment from supplier will be forwarded to one shift from 27/10 ~ 1/11
4. request early preparation for logistic truck from 31/10 ~ 1/11
5. Start from Monday 28/10 – Thursday 31/10, maximum overtime in production.
• Security runs in full team