EPA interprets the accumulation provisions in §262.34 as allowing generators to accumulate their waste for the allotted time period and to treat their waste in the accumulation unit, provided the generator complies with the requirements in §262.34 as well as the unit-specific requirements in Part 265 for tanks, containers, or containment buildings.