Check the results of the Step position test
Remarks:
The test contains of three test sequences (1st to 3rd test sequence)
Each test sequence contains of two testruns (1st and 2nd testrun)
Test criteria:
1) The maximum difference between Leak flow start and Leak flow end of each testrun in each test sequence is 2 L/min. If the difference in one of the testruns is higher than 2 L/min, the inspiration block needs to be exchanged.
2) In at least one of the three test sequences, the maximum difference between Leak flow start and Leak flow end of both testruns (1st and 2nd testrun) has to be smaller than 1 L/min. Otherwise, the inspiration block needs to be exchanged.