The length of time a generator is allowed to accumulate his or her waste will vary depending on the generator's classification, as illustrated in Table 2. The regulations pertaining to accumulation of hazardous waste on site are found in §262.34 for LQGs and SQGs, and in §261.5 for CESQGs.