Organize clean tidy carried materials member and alum Ms. on 12/12
A further material has been transported on the same day in the afternoon.
* Not figure carrying a LOT of equivalent quantities of materials is
That was incredibly worrying understand limits and how?
♦ at the mercy of manufacturer of materials transported quantities not delivered?
♦ You may care to control?
♦ Once go to R-RAT as I've said many times already control is impossible, because the [or change the delivery location] and do not
From week 4 a LOT during the chaos.
On December 12, alum and members of the materials in order to pieces are carried out in the afternoon of the same day added to materials. The number of LOT
※ loading can not be grasped, a substantial amount of material quantity is concerned, what do you think you are not willing to?
■ control has not carried on the quantity of material manufacturer in?
■ compliant limit impossible is already?
■ state control of theAs has been said many times, and the confused at the time corresponding to 4 LOT R in RAT moved temporarily to a destination (or change) and not from next week. At
翻訳結果の改善計画に関与して(結果はサーバに