When final revisions have been completed, Letter or stamp each drawing
with the words "RECORD DRAWINGS / AS-BUILT CONDITIONS" followed by the
name of the Contractor in letters at least 5 mm high. Mark original
contract drawings either "Record" drawings denoting no revisions on the
sheet or "Revised Record" denoting one or more revisions Date all
original contract drawings in the revision block.