Material for a heap of Random (zone 3) is taken from the results of excavations and the Foundation of the Cofferdam, dam, Spillway, konduit Conscientious (volume available 827,876.86 m3) as well as the quarry on the plan of the inundation 2,623,202.64 m3 which is about 0.5 Km (stock Pile).