Crews adjusted LO pressure gauge directions pressure of C/R with the engine side gage pressure.
. After of operation ,since stain of lubricating oil was so bad , I requested the
implementation of the regular service of LO purifier and strainer(1.2) cleaning to
C / E , and disembarked