Regarding our Shop Drawing for ALC work at Basement Floor Area, we got problem with Position of Column.
Base on Structure Design Drawing (1st Issue of piling work - date : October 2nd, 2013) Position Column at axist 4 line C' not same with Architecture Design Drawing. (Hit entrance door to Female Locker. Please see attachments drawing)
Maybe you need to re-design for 'Musholla Room" and relocated the door access to Female Locker.
And Mr. Billy, please send us first Dimension of opening for door & window at Basement Floor Area for completely our ALC Shop Drawing.
Many thanks for your attention & coorperation.