For example, if a generator produces 300 kg of hazardous waste in March, that waste must be managed in accordance with the SQG regulations; if the same generator produces 1,500 kg of hazardous waste in April, that waste must be managed in accordance with the LQG regulations (51 FR 10146, 10153; March 24, 1986).