The site has greater than 1,320 gallons of petroleum products stored in aboveground containers (e.g., ASTS, drums, and in pad-mounted transformers). According to facility personnel, the majority of the ASTs at the site were installed in 1958. The facility is in the process of conducting integrity testing of the ASTs (i.e., thickness testing).
The following are projected capital expenditures:
4 CM Steel/tank replacement: $330,000 in 2016
Install piping to spare tank to allow for blender tank overhaul: $100,000 in 2017
Install piping to bypass line tank for inspection and overhaul (2 Tank F): $200,000 in 2017
7 CM Steel/Tank replacement: $777,500 in 2017
2 CM Steel/tank replacement: $610,000 in 2018
3 CM Steel/tank replacement: $850,000 in 2019
Add Hemi tanks or second stage smart flow: $600,000 in 2020
Reasonable Case (RC) – Assume integrity inspection costs, plus tank overhauls/replacement per CAPEX.
Reasonable Worst Case (RWC) – Assume potential minor tank upgrade/repair costs in case of deficiencies identified and 15% contingency for unforeseen developments.
結果 (
日本語) 1:
[コピー]コピーしました!
サイトは 1,320 ガロン地上のコンテナーに格納されている石油製品のより大きい (例えば、AST、ドラムとパッド マウント変圧器)。施設職員によるとサイトで Ast の大半は 1958 年に設置。施設は、Ast の健全性試験を行っている途上です (すなわち、厚さ試験)。投影された資本的支出を次に示します。4 CM 鋼/タンク交換: 2016 年に $330,000ミキサー戦車オーバー_ホールように予備タンクに配管をインストール: 2017 年に 100,000 ドル配管検査用線タンクをバイパスし (2 タンク F) のオーバー ホールをインストール: 2017 年に $200,0007 CM 鋼/タンク交換: 2017 年に 777,500 ドル2 CM のスチール製/タンク交換: 2018 年に $610,0003 CM 鋼/タンク交換: 2019 年に $850,000ヘミのタンクを追加またはスマート フローを第 2 期: 2020 年までに $600,000合理的なケース (RC)-整合性検査費用を前提としてに加え、タンクの総点検/交換設備投資あたり。不備の場合想定潜在的なマイナーな戦車のアップグレード/修理費用と予期せぬ展開の 15% 不測の事態への合理的な最悪ケース (RWC) –。