(7) After finishing all Tie rods fastening to 60 N・m, back to first couple of Tie rods to give them up to 90 N・m torque. Fasten Tie rod till third line on Rod with magnet holder comes out from the hole of Magnet plate. Repeat festinating action to other Tie rods. The tie rod torque will be at about 90 N・m.
(8) Finally recheck if all Tie rods torque are attained to 90 N・m by Torque wrench.
Forth line means 110 N・m. In case of heavy leakage from the electrolyzer, fasten the Tie rods up to 110 N・m.