In general the plans borrow area materials material impermeable soil core (core material) to Kolhua Dam plan can be obtained from some place like Image 5.4 (location map of Borrow area).
Material mounds of dirt and clay that is useful for the dam core materials, pretty much acquired especially its location on the area of inundation and surrounding areas, spread out along both sides of the cliff as kolovial deposits.