After installation at Customer in April 2015, a series of Toellner Loading System issues were observed.
No success after Toellner’s troubleshooting attempts including various modification and re-designing.
Customer could not run unmanned operaton and started requesting the return in September 2016.
System replacement started being discussed first with a robotics instead of Toellner and then exchange the whole system for Wasino with Loading System.