Given the availability of material material for sand and gravel for concrete nearby is very limited and should do crushing at the location of the quarry the distance is approximately 40 km away.
Considering the economic value then the concrete needs for dam construction semantok diambilkan of concrete so the (ready mix) closest to the location of the job.